Coal Iron Usage 8 inch HSD8 DTH Hammer rock drilling equipment

  • Brief info:Coal Iron Usage 8 inch HSD8 DTH Hammer rock drilling equipment, US $ 500 - 1,000 / Piece, Hunan, China, SOLLROC, Drill Hammer.Source from Changsha Sollroc Engineering Equipments Co., Ltd. on Alibaba.com.
We will reply in 24 hours.

 Coal Iron Usage  8 inch HSD8 DTH Hammer rock drilling equipment

 Coal Iron Usage  8 inch HSD8 DTH Hammer rock drilling equipment

About us:

We are a leading manufacturer of rock drilling tools, like DTH hammers and bits, DTH drill pipes, RC hammers and bits, tophammer button bits, coupling, cross bits, drill rods located in Changsha, Hunan, 

China.We have rich experience in this field of DTH hammers and bits for 20 years.Owing to high

quality, professional serivce and competitive price, we have gotton good reputation from our customers 

all over the world, such as France, Spain, Italy, South Africa, Australia, Iran, Malaysia, etc.

 

Product Application:

DTH hammers and bits are widely used in underground mining, quarries, hydraulic and Hydro-Power Engineering, water well drilling, Mineral exploration, anchoring hole drilling, geothermal engineering, Subway excavation, another civil engineering. it has the advantage of high flatness, smooth hole wall, high rigid of drill rod and hammer, independent of high axial thrust, no limit of drilling depth, low cost of devices and easiness to maintain.

 

Product Description:

8 inch Drill Hammer, SD8 DTH Hammer

   Item
Hammer OD
Weight(kg)
   Top sub threadWorking PressureRecommended rotation speed 
HSD 8 DTH Hammer
 
185mm
 
192kg
 
API 4 1/2"REG
 
1.0-2.5Mpa
 
 15-25r/min

 

 

Product photos:

Quality warranty:

Our hammers are made of high quality steel and all spares are inspected strictly before shipping. We have quickly responses for your complaint and suggestion.


Package:

Using ply-wooden cases and pallet for exporting to protect products and avoid the damagement during transportation. Also we can customize package according to your special requests.


Production time:

Generally, Production time is 15 -25 days.


Transportation:

By air, By Express or By sea according to your requests.